Temporary connection
for your construction site.

Site connection sanctioned, meter installed, and cleanly disconnected when the project ends. We handle every BESCOM step so construction doesn't wait on paperwork.

10–20 day install Sanctioned for 6 months Convertible to permanent
Connection
1Ø or 3Ø
Install time
10–20 days
Validity
6 months
Convertible
To permanent
Who this is for

Common use cases

🏗️

Independent house construction

Power for mixers, drills, lighting, and curing during your build. Convert to permanent residential when complete.

🏢

Apartment or builder projects

Site connection for multi-floor projects — phased load increase as construction progresses.

🔧

Renovation or extension

Existing meter not enough for heavy renovation work? Add a temporary connection for the duration.

What we handle

Connection on site, paperwork off your plate

Builders and owner-builders both run into the same blocker — no site power, no real progress. We get the connection live so your crew can start work.

  • Load calculationRight kW for your construction phase — slab pour, mixers, welding, lifts.
  • Application & filingTemporary connection form with site plan, ownership proof, and load schedule.
  • Deposit & BESCOM estimateWe get the official estimate, you pay BESCOM directly, we handle the receipt.
  • Site visit & inspectionBESCOM officer visit scheduled, tracked, and follow-up done if anything stalls.
  • Meter installationTemporary meter fitted, supply switched on, ready for site work.
  • End-of-project disconnectClean disconnection, deposit refund, or conversion to permanent — your call.
Temporary tariff is higher per unit

Temporary connections are billed at a higher rate than residential. Plan to convert to permanent as soon as the building is ready for occupancy — we handle that switch too.

Documents needed

What to keep ready

How it works

From site to switch-on

1

Share site details

Plot location, construction stage, load needed. We quote an all-in number.

2

Application filed

Temporary connection form submitted with all attachments at the right division.

3

Deposit & inspection

BESCOM site visit, deposit payment, sanction order issued.

4

Meter installed

Temporary meter fitted, supply on, your crew can start.

Frequently asked

Temporary connection — your questions

Typically 10–20 working days from application to meter installation. Faster if your documents and site are ready upfront.
Usually sanctioned for 6 months and can be extended. Most projects convert to permanent once construction completes.
Yes — temporary tariff is higher per unit than residential. Plan to switch to permanent as soon as your building is ready for occupancy.
Yes — once the building has OC or is ready, we handle the conversion to a permanent residential or commercial connection.
Yes — BBMP or panchayat-approved plans are required. If approval is pending, share what you have and we'll advise on the best route.