A new BESCOM connection,
live in 15–30 days.

Moving into a new build? Setting up a shop, office, or factory? We handle the entire BESCOM new-connection process — application, load sanction, deposit, inspection, meter install.

Single-phase & three-phase Licensed contractor Transparent quote
Connection types
1Ø & 3Ø
Turnaround
15–30 days
Property types
Home · Shop · Office
Success rate
99.8% approved
Who this is for

When you need a new connection

🏡

New home or flat

Moving into a freshly built house with no existing meter — we get you connected with the right sanctioned load.

🏪

Shop or commercial space

Opening a retail store, office, café, or salon. Commercial tariff with three-phase load if needed.

🏭

Workshop or small unit

Industrial connection for small manufacturing, godown, or workshop with high-load equipment.

What we handle

From paperwork to power-on

A new connection has more moving parts than a transfer — load calculation, wiring inspection, deposit, meter install. We coordinate every step.

  • Load assessmentWe work out the right kW sanction for your appliances — too low means tripping, too high means wasted deposit.
  • Application filingForms drafted, documents attached, and filed at the right BESCOM sub-division for your property.
  • Wiring test reportCoordinated through a licensed electrical contractor — mandatory before BESCOM approves the connection.
  • Deposit payment & estimateWe get the BESCOM estimate, you pay the deposit, and we handle the receipt and confirmation.
  • Site inspectionBESCOM officer visit scheduled and tracked — we make sure they show up and clear the file.
  • Meter installation & energizationThe final step — meter fitted, supply switched on, and RR number issued in your name.
Pricing depends on your case

BESCOM deposit is calculated per sanctioned kW and varies by property type. We give a clear written quote before any payment — no surprises.

Documents needed

What to keep ready

Forward these on WhatsApp to start. We'll let you know if anything's missing.

How it works

From application to power-on

1

Share details

Property type, area, and approximate load needed — we quote a fixed all-in price.

2

Filing & inspection

Application filed, wiring report coordinated, BESCOM site visit scheduled.

3

Deposit & sanction

BESCOM issues the estimate, you pay the deposit, sanction order released.

4

Meter & power on

Meter installed, supply energized, RR number issued in your name.

Frequently asked

New connection — your questions

Typically 15–30 working days from application to meter installation. Speed depends on load category, site readiness, and how quickly the wiring report comes through.
Total cost = BESCOM deposit (based on sanctioned kW) + our service charge. We give a clear written all-inclusive quote before any payment.
Yes — BESCOM requires a wiring inspection report from a licensed electrical contractor before approving a new connection. We coordinate this so you don't have to chase a separate vendor.
Yes — for higher-load homes (multiple ACs, lift, EV charger, large appliances) three-phase makes sense. We'll help decide based on your actual load.
Tariff slab and deposit are different. Commercial usage on a residential meter risks penalty and disconnection — always apply under the correct category from day one.