Adding ACs, an EV charger, workshop equipment, or shifting to commercial use? Your sanctioned load needs to match. We file the enhancement and get the meter and cabling upgraded.
Two new ACs and a high-capacity geyser usually push existing sanctioned load over the limit.
Home EV chargers draw 3–7kW continuously — almost always need a load upgrade.
Welding, lathes, large pumps, commercial kitchens — heavy three-phase load needed.
Running over the sanctioned load can trigger BESCOM penalties and constant tripping. Enhancement isn't just paperwork — the meter, cable, and sometimes the phase need to physically change.
BESCOM can detect excess load draw — and the penalty plus arrears can stack up to many times more than enhancement cost. Fix it before they catch it.
Current sanction + what you're adding. We recommend the right kW.
Enhancement form with load schedule submitted at your division.
Additional deposit paid, cabling and panel upgraded if needed.
New meter installed if needed, sanction certificate delivered.
Tell us what you're adding and we'll size it correctly.